NITROGEN NEEDLE + ADAPTOR MOTION PRO 08-0075
Motion Pro Nitrogen Needle Kit 08-0075 is designed for filling gas-charged shocks with self-sealing rubber valves. It is intended for use with the Motion Pro Nitrogen Shock Gauge 08-0072. Features include enabling shock filling with self-sealing rubber valves, compatibility with select Yamaha, Fox, and Öhlins shock absorbers, and inclusion of necessary components for installation. Made in the USA. Specifications include a 22-gauge needle, 1-inch needle length, and compatibility with self-sealing rubber valve shocks. Constructed from high-quality components for durability. Includes usage instructions and safety precautions.
- SKU
- 00-075.MP
- Brand
- Motion Pro
- Availability
- Out of Stock
FULL DESCRIPTION
Motion Pro Nitrogen Needle Kit with Adaptor
The Motion Pro Nitrogen Needle Kit (Part No. 08-0075) is specifically engineered for servicing gas-charged shock absorbers that feature self-sealing rubber valves. This essential tool is designed to work in conjunction with the Motion Pro Nitrogen Shock Gauge (part number 08-0072) to ensure accurate and efficient shock maintenance.
Key Features:
- Facilitates the filling of shocks equipped with self-sealing rubber valves.
- Designed for use with select Yamaha, Fox, and Öhlins shock absorbers.
- Optimized for integration with the Motion Pro Nitrogen Shock Gauge (08-0072).
- Includes all necessary components for proper setup and operation.
- Manufactured in the USA to high standards.
Specifications:
- Needle Gauge: 22
- Needle Length: 1 inch
- Compatibility: Shocks with self-sealing rubber valves.
- Material: Constructed from high-quality components for enhanced durability.
Usage Instructions:
- Disconnect the hose assembly from the nitrogen gauge body (08-0072).
- Install the nitrogen needle adaptor into the gauge body, utilizing pipe sealant or Teflon® tape.
- Unscrew the retainer nut from the adaptor and slide the needle onto the stainless steel tube that extends from the adaptor.
- Carefully place the O-ring over the needle.
- Reattach the retainer nut and tighten until the O-ring and needle are securely seated against the adaptor.
- Locate and remove the screw covering the self-sealing rubber valve on the shock.
- While supporting the reservoir body, insert the needle into the valve as perpendicularly as possible to prevent bending or damage.
- Adjust the nitrogen tank regulator to the pressure recommended by the shock manufacturer and pressurize the shock accordingly.
- Following inflation, carefully withdraw the needle and reinstall the cover screw over the valve.
- When not in use, place the protective cover over the needle.
Safety Precautions:
- Always wear appropriate eye protection to guard against potential hazards from escaping gas or debris.
- Direct the needle away from yourself and others at all times.
- Adhere strictly to the shock manufacturer's guidelines and ensure filling is done only to the specified pressure.


